SmartLog Maasheseweg 83 Venray

  • close to the highway A73
  • total 53,145 m²
  •  located in an industrial area

SMARTLOG VENRAY is a new, high quality logistics distribution centre development, strategically located in North Limburg in the Smakterheide business park. Its immediate proximity to the German hinterland and its multimodal infrastructure are just a few of the excellent features that have resulted in many European Distribution Centres being based here. Smakterheide business park distinguishes itself through the large scale logistics activities carried out there. This logistics hotspot is where Flextronics, Ceva, XPO, Jabil and Moduslink are based for example.

The area of the logistics complex is 53,145 m² and consists of 3 high quality DCs including mezzanine and officer space. All DCs are fitted with an ESFR sprinkler system (centralised water supply) and therefore suitable for storing mechanise.

Delivery is scheduled for Q1 2020.

Download brochure Contact us

Area and Rental Prices Warehouse Venray

DC 1
Warehouse 19.694 m²
Mezzanine 2.531 m²
DC 2
Warehouse 15.946 m²
Mezzanine 1.332 m²
Office space 340 m²
DC 3
Warehouse 11.990 m²
Mezzanine 962 m²
Office space 350 m²
Totale surfce 53.145 m²

m² mentioned are subject to final delivery level

Warehouse € 47,00 per m² per year
Mezzanine € 25,00 per m² per year
Office space € 120,00 per m² per year

Rental prices are exclusive VAT and service costs

Delivery level

  • ESFR – Sprinkler installation with central water supply point;
  • Smooth concrete floor with evenness class Zeile 5 in compliance with DIN 15,185;
  • Floor loading 5,000 kg/m², expedition room 2,500 kg/m²;
  • The point loading underneath the shelving is 90 kn²;
  • Concrete loading space;
  • Free height 12.20 metres;
  • Hydraulic dock levellers (8 tons), electrically operable;
  • Electric overhead doors on each loading dock;
  • Minimum of 1 dock per 800 m²;
  • Electrically operable overhead doors on ground level measurement 4,000 mm x 4,500 mm;
  • Dock shelter with bumpers and wheel guidance;
  • Fire hose reels, in compliance with the requirements set by the fire department;
  • Fire detection and evacuation installation;
  • Connection points battery chargers (5 connections);
  • Sufficient 230v and 400v connections;
  • Light streets in the expedition zone;
  • Building LED-lighting, average of 250 lux, 1 metre above floor surface;
  • Motion detector per hallway zone;
  • Direct ignition heaters (minimum room temperature 5 °C);
  • Sanitary fittings.

  • Large entrance;
  • Smooth finished floors in the offices;
  • VRF climate system (21°C);
  • Mechanical ventilation system;
  • Ceiling system equipped with integrated LED-lighting (500 lux);
  • Cable ducts for data, phone and internet;
  • Toilet facilities on both floors;
  • Plaster walls;
  • Pantry room on both floors.

  • Brick pavement;
  • Site is closed-off through a 2 metre high double rod fencing;
  • Closable electric access gate(s);
  • Sewer system;
  • Exterior lighting;
  • Connection point for electrical rechargeable passenger cars (2 connections);
  • Ample parking spaces for passenger cars.